logo

Upgrades to the Pickerel River Water Treatment Plant and Tower of supervisory control and data acquisition (SCADA) System

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

Pickerel River water Treatment Plant requires a Supervisory Control Data Acquisition System Upgrade and electrical wiring upgrade to the Water Treatment Tower to ensure water continues to flow out of water treatment tower. We presently have a Bristol Programmable Logic Controller (PLC) system but it is not working sufficiently and is showing signs of failure. We are looking at the installation of

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Upgrades to the Pickerel River Water Treatment Plant and Tower of supervisory control and data acquisition (SCADA) System

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Upgrades to the Pickerel River Water Treatment Plant and Tower of supervisory control and data acquisition (SCADA) System” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Pickerel River water Treatment Plant requires a Supervisory Control Data Acquisition System Upgrade and electrical wiring upgrade to the Water Treatment Tower to ensure water continues to flow out of water treatment tower. We presently have a Bristol Programmable Logic Controller (PLC) system but it is not working sufficiently and is showing signs of failure. We are looking at the installation of an allen bradley compact PLC system. This system is what controls the water treatment plant and water tower which we are urgently in need of to continue to maintain our water to community members to control the chlorine intake and so we don’t open the valves. Also with the replacement of a Iconics Genesis Supervisory Control Data Acquisition Software with the Allen bradley factory talk view Supervisory Control Data Acquisition system with development and runtime software for both the Supervisory Control Data Acquisition and Programmable Logic Controller hardware. This equipment will monitor the water and ensure control of water tower and treatment plant. All computer monitoring and all wiring is done at the water tower on-site. The operations must have the same tool and devices. The computer Supervisory Control Data Acquisition control Graphics is one of these components. The new runtime and software will have a one year support. This project will ensure safe, reliable water supply and reduce the potential burden on the Provincial health system.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project