logo

Upgrading, Improvement and Rehabilitation of pumps #1 and #2, pump camera and mag meter at the Finch Water Treatment Facility

One of 10,000+ projects Taiyo tracks in Ontario.

Source: Infrastructure Canada

Project
Completed

The Finch Water Treatment Facility is in need of the most rehabilitation and replacement of key infrastructure. Of the key pieces of infrastructure to be replaced are both well pumps #1 and #2 as well as the well pump cameras, the replacement of the mag meter for treated effluent and the complete replacement of the high lift pump for the Finch water tower. These projects are listed as medium or hi

Status
Closed
Sector
Water Supply and Storage, Natural Gas, Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Upgrading, Improvement and Rehabilitation of pumps #1 and #2, pump camera and mag meter at the Finch Water Treatment Facility

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Upgrading, Improvement and Rehabilitation of pumps 1 and 2, pump camera and mag meter at the Finch Water Treatment Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Finch Water Treatment Facility is in need of the most rehabilitation and replacement of key infrastructure. Of the key pieces of infrastructure to be replaced are both well pumps #1 and #2 as well as the well pump cameras, the replacement of the mag meter for treated effluent and the complete replacement of the high lift pump for the Finch water tower. These projects are listed as medium or high priority for replacement. Upgrades are also needed on the Natural gas unit heater at the water treatment plant, as well as the need for a replacement mag flow meter well. The Chlorine Analyzer Distribution System is also in need of replacement within the next few years. The doors on the facility are in need of replacement as they are starting to corrode and the roof is reaching the end of its projected lifespan.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Natural Gas, Government

Article published date

2026-03-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project