logo

Upgrading, Improvement and Rehabilitation of pumps #1 and #2, pump camera and mag meter at the Finch Water Treatment Facility

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The Finch Water Treatment Facility is in need of the most rehabilitation and replacement of key infrastructure. Of the key pieces of infrastructure to be replaced are both well pumps #1 and #2 as well as the well pump cameras, the replacement of the mag meter for treated effluent and the complete replacement of the high lift pump for the Finch water tower. These projects are listed as medium or hi

Project Information FAQ

Project Information

4 Q
The project “Upgrading, Improvement and Rehabilitation of pumps 1 and 2, pump camera and mag meter at the Finch Water Treatment Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Finch Water Treatment Facility is in need of the most rehabilitation and replacement of key infrastructure. Of the key pieces of infrastructure to be replaced are both well pumps #1 and #2 as well as the well pump cameras, the replacement of the mag meter for treated effluent and the complete replacement of the high lift pump for the Finch water tower. These projects are listed as medium or high priority for replacement. Upgrades are also needed on the Natural gas unit heater at the water treatment plant, as well as the need for a replacement mag flow meter well. The Chlorine Analyzer Distribution System is also in need of replacement within the next few years. The doors on the facility are in need of replacement as they are starting to corrode and the roof is reaching the end of its projected lifespan.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data