logo

Upgrading of Constance Bridge along B117 Road at St Remi Road

Sector: Bridge • Location: Mauritius

Source: Road Development Authority (RDA), Mauritius (Projects)

Project
Closed

The existing bridge is located along B117 Road. It is approximately 14m long and 6m wide and is made up of steel plate resting on arch steel girders supported by masonry abutments at the two extremities. The absence of footpath along the bridge represented a potential hazard for pedestrians. Moreover, the existing bridge is showing signs of structural deterioration. Hence, there was need for demol

Project Information FAQ

Project Information

4 Q
The project “Upgrading of Constance Bridge along B117 Road at St Remi Road” is an infrastructure initiative in the Bridge sector, located in Mauritius. Taiyo aggregates data on it from Road Development Authority (RDA), Mauritius (Projects).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The existing bridge is located along B117 Road. It is approximately 14m long and 6m wide and is made up of steel plate resting on arch steel girders supported by masonry abutments at the two extremities. The absence of footpath along the bridge represented a potential hazard for pedestrians. Moreover, the existing bridge is showing signs of structural deterioration. Hence, there was need for demolition of the existing bridge and reconstruction of a reinforced concrete bridge as per International Standard. The new RC bridge is 28m long (2 span of 14m each) and 12m wide (including 2m footpath on each side of the bridge), supported central by RC piers and at both extremities by RC abutment. The new bridge will also have improved hydraulic capacity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data