Upgrading of existing 300mm Sanitary Sewer on Greenwich Drive to 450mm
Completed · Ontario
Source: Infrastructure Canada
Identified through the 2013 Master Servicing Plan this project includes the upgrade of approximately 1,186 meters of 450mm sewer on Greenwich Drive and Icomm Drive from the Greenwich sewage pump station (SPS) to west of Clarence St. South. The existing 300mm sewer poses existing capacity constraints as well as limits future growth within the downtown core (to 2031). The sewer on Greenwich Drive co
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Commercial
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Upgrading of existing 300mm Sanitary Sewer on Greenwich Drive to 450mm
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Identified through the 2013 Master Servicing Plan this project includes the upgrade of approximately 1,186 meters of 450mm sewer on Greenwich Drive and Icomm Drive from the Greenwich sewage pump station (SPS) to west of Clarence St. South. The existing 300mm sewer poses existing capacity constraints as well as limits future growth within the downtown core (to 2031). The sewer on Greenwich Drive collects flow from approximately 1000 properties from West Brantford. The majority of the properties are single detached and multi-family residences with a small portion of commercial and industrial properties. |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Commercial |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
