logo

Upgrading of existing railway infrastructure between Villa Opicina station and Sezana station

Sector: Rail • Location: Italy, Slovenia

Source: EU Funding & Tenders Portal

Project
Ongoing

The Action is located on the cross-border railway section Trieste-Divača, a part of the Rail Freight Corridor and of two core TEN-T Corridors, namely the Mediterranean and the Baltic – Adriatic. It is part of the global project aiming at assuring interoperability, sufficient infrastructure capacity, removal of bottlenecks and shift to rail at this TEN-T section between Italy and Slovenia. Throug

Project Information FAQ

Project Information

3 Q
The project “Upgrading of existing railway infrastructure between Villa Opicina station and Sezana station” is an infrastructure initiative in the Rail sector, located in Italy, Slovenia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ongoing

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Action is located on the cross-border railway section Trieste-Divača, a part of the Rail Freight Corridor and of two core TEN-T Corridors, namely the Mediterranean and the Baltic – Adriatic. It is part of the global project aiming at assuring interoperability, sufficient infrastructure capacity, removal of bottlenecks and shift to rail at this TEN-T section between Italy and Slovenia. Through an Intergovernmental Commission, Italy and Slovenia have established that the enhancement of the railway infrastructure in this section shall be achieved by upgrading of the existing infrastructure, instead of construction of a new railway line which can be postponed to a medium-long term scenario. The Action encompasses three work packages, namely upgrading of Villa Opicina railway station (WP1), elaboration of Executive Design for upgrading of Sežana railway station and railway section between Sežana and state-border with Italy (WP2) and Coordination (WP3). With execution of the project, the following objectives will be met: • The upgraded railway station Villa Opicina will correspond to interoperability and TSI standards on TEN-T core network; • The bottleneck on this railway line will be removed and operations in the Villa Opicina station will be more efficient; • The main outcome of the WP2 will be the completed executive design documentation which will allow commencement of construction works under the next phase of the Global Project. The action, through the Global Project, will contribute to improved technical parameters of the railway line b.c. IT/SI-Sežana, notably with higher speeds, possibility of running 740 m long trains for freight transport, and achievement of interoperability standards as required by regulations on TSI. The Action will be implemented in partnership of Rete Ferroviaria Italiana, Ministrstvo za Infrastrukturo and GEIE FERROVIA TRIESTE-DIVAČA (department EEIG Railway Trieste-Divača).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data