logo

Upgrading of Water, Wastewater and Stormwater Infrastructure on O’Meara Boulevard (Prospect Street to McCamus Avenue)

Sector: Water Supply and Storage • Location: Ontario, Canada

Source: Infrastructure Canada

Project
Completed

The proposed reconstruction project includes multiple components including storm sewer, watermain, and sanitary sewer construction. The project is within the Drainage area D10 includes O’Meara Boulevard from intersection of Prospect Street to McCamus Avenue within the Town of Kirkland Lake. The current public health and safety problem impacting the residents within the area of reconstruction are r

Project Information FAQ

Project Information

4 Q
The project “Upgrading of Water, Wastewater and Stormwater Infrastructure on O’Meara Boulevard (Prospect Street to McCamus Avenue)” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed reconstruction project includes multiple components including storm sewer, watermain, and sanitary sewer construction. The project is within the Drainage area D10 includes O’Meara Boulevard from intersection of Prospect Street to McCamus Avenue within the Town of Kirkland Lake. The current public health and safety problem impacting the residents within the area of reconstruction are related to all project components. 1. The storm sewer is 81 years old. Storm sewer problems are quite visible each spring or with intense rainfalls causing flooding within the drainage area. The priority of these works considers firstly to prevent the health and safety concern of localized flooding. 2. The sanitary system is 81 years old and constructed with clay material which passes way beyond its life expectancy. Sanitary sewer breaks, blockages and sewer back ups into residential homes pose a significant health and safety concern that must be avoided. Due to the age and material used to construct the system there is significant risk of failure. 3. The water mains are 86 years old and were constructed with ductile iron pipes. Watermain breaks occurs quite often in this section despite an aggressive by-annual water main flushing program we continue to receive discolored water complains from residents within this area. Residents have been vocal in expressing their health concerns related to discolored water and the frequency which they encounter discolored water. Due to age and the material of this section watermain there is a significant risk of contamination and health concern for local residents of this area. The project would reduce the current public health and safety problems by way of the new infrastructure. A new and properly sized storm system will reduce if not eliminate the localized flooding. New sanitary sewers will reduce the possibility of sewage backup into residents homes. New water-mains will reduce the instances of discolored water.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data