Uplift Utv Building TI
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Tenant Improvement, Occupied Remodel. Demo Existing Interior Electrical And Lights. Provide New Interior Walls, Doors, Glazing, Frames, Electrical, Millwork, Plumbing, Ceiling, Lights, And Finishes. Provide New Hvac Units And Distribution As Required. Total Square Feet: 5155
- Status
- Prospective
- Sector
- Automotive, Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Phoenix, Arizona, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Uplift Utv Building TI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Tenant Improvement, Occupied Remodel. Demo Existing Interior Electrical And Lights. Provide New Interior Walls, Doors, Glazing, Frames, Electrical, Millwork, Plumbing, Ceiling, Lights, And Finishes. Provide New Hvac Units And Distribution As Required. Total Square Feet: 5155 |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Phoenix |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Automotive, Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
