Upower Honduras Solar Power Plants
Sector: Commercial • Location: Honduras
Source: World Bank Group
Upower Honduras, a partnership of the American companies Upower (80%) and 3G Energy (20%), announced the construction and operation of two power plants located at La Gaceta, Nacaome region (each power plant with 50 MW in capacity). In January 2014, Upower was granted a 20-year power purchase agreement with the state-owned electricity distribution company ENEE.
The special purpose companies Produc
- Status
- Prospective
- Sector
- Commercial, Power Generation (CCGT), Solar, Government
- Location
- Honduras
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Upower Honduras Solar Power Plants
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upower Honduras, a partnership of the American companies Upower (80%) and 3G Energy (20%), announced the construction and operation of two power plants located at La Gaceta, Nacaome region (each power plant with 50 MW in capacity). In January 2014, Upower was granted a 20-year power purchase agreement with the state-owned electricity distribution company ENEE. The special purpose companies Produccion de Energia Solar y Demas Renovables, S.A. (PRODERSSA) and Pacific Solar Energy, Inc. (PSE) were established to manage the projects. The investment was estimated at US$ 190 million. In September 2014, Upower signed an EPC contract with the american company WTEC. Information on the precise date the construction works started was not available. Commercial operation commenced in May 2015. In December 2015, BCIE approved a US$ 40 million loan to Pacific Solar. |
Original sector | Energy |
Budget |
Location
Country | Honduras |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Power Generation (CCGT), Solar, Government |
Article published date | 2024-06-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
