Upper Arkansas River NRDAR: Native Plant Propagation at Hayden Ranch
Sector: Water Supply and Storage • Location: United States of America
Source: Grants.gov
The tasks to be performed under this agreement are as follows:Task 1: Project Planning and DesignThe planning and design phase of the project will draw on work completed to date with information and analysis of existing site conditions completed by project team members.The Planning and Design process will include the following:Obtain and set up base maps for the projectDevelop an architectural des
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | archived |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The tasks to be performed under this agreement are as follows:Task 1: Project Planning and DesignThe planning and design phase of the project will draw on work completed to date with information and analysis of existing site conditions completed by project team members.The Planning and Design process will include the following:Obtain and set up base maps for the projectDevelop an architectural design of greenhouse compatible with the existing historic structures including structural engineeringConduct an energy analysis including design of integrated system; for example a combination of alternative energy options.Complete final plans, including construction documents.Task 2: Determine Water Supply and Augmentation NeedsThe Recipient will determine demand and design water-related systems to irrigate greenhouse and outdoor plots. This task includes any water related engineering and legal services required to complete documents to legally use water for the project.Task 3: Determine Design of Outdoor Plots and Environmental Data CollectionThe Recipient will, with assistance from the Service, collect environmental data regarding existing conditions on the property as well as to assist in design of outdoor plots. Outdoor plots will be designed for optimal irrigation, drainage, plantings, and fencing.Task 4: Project CoordinationThe Recipient will provide overall project management and administrative oversight of the Upper Arkansas River NRDAR Native Plant Propagation at Hayden Ranch fromgreenhouse outdoor plot planning through implementing those plans. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
