Upper Beaver Gold-Copper Project
The owner, status and timeline of this project. A free account opens every field.
Source: Canadian Mining Journal
A redevelopment project of a historic mine into a modern underground and open-pit gold-copper operation including a processing facility and related infrastructure near Kirkland Lake, Ontario. The project is projected to cost over $1 billion and create 800 jobs, producing 210,000 oz. of gold and 3,600 tonnes of copper annually over 14 years.
- Status
- Prospective
- Sector
- Metal
- Location
- Kirkland Lake, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Canadian Mining Journal
ConstructChat
Ask ConstructChat about Upper Beaver Gold-Copper Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A redevelopment project of a historic mine into a modern underground and open-pit gold-copper operation including a processing facility and related infrastructure near Kirkland Lake, Ontario. The project is projected to cost over $1 billion and create 800 jobs, producing 210,000 oz. of gold and 3,600 tonnes of copper annually over 14 years. |
Original sector | Mining |
Budget |
Location
Country | Canada |
State | Ontario |
City | Kirkland Lake |
Source
Source | Canadian Mining Journal |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2026-05-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
