logo

Upper Bhote Koshi Hydropower Plant

Sector: Wind • Location: Nepal

Source: World Bank Group

Project
Active

The 36-MW, $98.2 million, Upper Koshi Hydropower Plant (run-of-river) was developed by the Bhote Koshi Power Company Private Ltd. (BKPC). As of December 2008, Himal International Energy Private Limited (HIEPL) was the major shareholder in BKPC (75%). The remaining equity was owned by Himal International Power Corporation Pvt. Ltd. (10%), Tara Fund Pvt. Ltd (10%) and RDC (5%) of Nepal. Mr. Siddhart

Status
Prospective
Sector
Wind, Hydro, Power Generation (CCGT), Commercial, Manufacturing (Industrial), Government
Location
Nepal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Upper Bhote Koshi Hydropower Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Upper Bhote Koshi Hydropower Plant” is an infrastructure initiative in the Wind sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 36-MW, $98.2 million, Upper Koshi Hydropower Plant (run-of-river) was developed by the Bhote Koshi Power Company Private Ltd. (BKPC). As of December 2008, Himal International Energy Private Limited (HIEPL) was the major shareholder in BKPC (75%). The remaining equity was owned by Himal International Power Corporation Pvt. Ltd. (10%), Tara Fund Pvt. Ltd (10%) and RDC (5%) of Nepal. Mr. Siddhartha SJB Rana was the chairman of all these companies. The project was being built through a 40-year BOOT contractual framework. At the end of 25 years, 50% ownership in BKPC will be transferred to the Nepal Electricity Authority (NEA), with the remaining 50% stake to be transferred at the end of the 40-year license period. The Upper Bhote Koshi plant is located on the Bhote Koshi River, 110-km for Kathmandu. The project includes the development of a 25-km, 132-kV transmission line. Harza provided the preliminary design for the project. The project consisted of 2 turbines of 22MW, Francis Type.Annual generation was 246GWh. Financial closure was reached June 24, 1996. In addition to its $3 million equity stake, the IFC provided a $21 million direct (A) loan and a $27 million syndicated (B) loan in its fiscal year 1996. In fiscal year 1998, the IFC approved an additional $24 million syndicated loan and an $3 million risk management facility. The US Trade Development Agency is providing $30.0 million in export credits. A 25-year power-purchase-agreement was signed with the NEA and is expected to total 250,000 MW hours annually. Tariffs are set at $0.06/KWh, to be increased by 3% per year and indexed to the US CPI rate. Coordinates: 27°56'20?N 85°56'42?E http://en.wikipedia.org/wiki/Bhote_Koshi_Project

Original sector

Energy

Budget

Location

Country

Nepal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Hydro, Power Generation (CCGT), Commercial, Manufacturing (Industrial), Government

Article published date

2024-06-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project