Upper Blackstone Wastewater Treatment Facility
Sector: Cement • Location: United States of America (USA)
Source: Walsh
The first phase of this project involved the installation of a new 84-inch concrete pipe connected to a new screening facility and aerated grit tanks. A new primary settling tank was constructed, and six existing tanks were remodeled. A multiple hearth furnace and three electrodynamic venturis were demolished, and two new 10.5-ft-diameter wet electrostatic precipitators were installed. The second
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The first phase of this project involved the installation of a new 84-inch concrete pipe connected to a new screening facility and aerated grit tanks. A new primary settling tank was constructed, and six existing tanks were remodeled. A multiple hearth furnace and three electrodynamic venturis were demolished, and two new 10.5-ft-diameter wet electrostatic precipitators were installed. The second phase required construction of an aeration tank and two final settling tanks, as well as renovations to three existing aeration tanks and six existing final settling tanks. Work included installation of new diffused air systems, installation of eight new clarifiers, renovation of a maintenance building, construction of a support facility, site demolition, yard piping and hazardous soil remediation. The plant maintained its full operational capacity of 160 MGD during construction. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
