logo

Upper Blackstone Wastewater Treatment Facility

Sector: Cement • Location: United States of America (USA)

Source: Walsh

Project
Completed

The first phase of this project involved the installation of a new 84-inch concrete pipe connected to a new screening facility and aerated grit tanks. A new primary settling tank was constructed, and six existing tanks were remodeled. A multiple hearth furnace and three electrodynamic venturis were demolished, and two new 10.5-ft-diameter wet electrostatic precipitators were installed. The second

Project Information FAQ

Project Information

4 Q
The project “Upper Blackstone Wastewater Treatment Facility” is an infrastructure initiative in the Cement sector, located in United States of America (USA). Taiyo aggregates data on it from Walsh.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The first phase of this project involved the installation of a new 84-inch concrete pipe connected to a new screening facility and aerated grit tanks. A new primary settling tank was constructed, and six existing tanks were remodeled. A multiple hearth furnace and three electrodynamic venturis were demolished, and two new 10.5-ft-diameter wet electrostatic precipitators were installed. The second phase required construction of an aeration tank and two final settling tanks, as well as renovations to three existing aeration tanks and six existing final settling tanks. Work included installation of new diffused air systems, installation of eight new clarifiers, renovation of a maintenance building, construction of a support facility, site demolition, yard piping and hazardous soil remediation. The plant maintained its full operational capacity of 160 MGD during construction.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data