Upper Central Street Water Main Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work consists of replacing existing 10-inch cast iron water main with approximately 950 linear feet of new 12-inch ductile iron water main on Upper Central Street in Winchendon, MA from Maple Street to Jackson Street. The work also includes the installation of valves and hydrants, service reconnections, side street reconnections, surface restoration, and abandonment of the existing water main.
- Status
- Closed
- Sector
- Metal, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Commercial
- Location
- Winchendon, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Upper Central Street Water Main Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work consists of replacing existing 10-inch cast iron water main with approximately 950 linear feet of new 12-inch ductile iron water main on Upper Central Street in Winchendon, MA from Maple Street to Jackson Street. The work also includes the installation of valves and hydrants, service reconnections, side street reconnections, surface restoration, and abandonment of the existing water main. The work includes alternates for swapping services, hydrants, and side street connections from t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Winchendon |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Steel, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
