Upper Clipper Street Traffic Calming Project
Sector: Automotive • Location: San Francisco, California, United States of America
Source: SFMTA Projects
Upper Clipper Street Traffic Calming Project Share this: Facebook Twitter LinkedIn Project Introduction Clipper Street will be repaved by San Francisco Public Works in late 2017. In coordination with this effort, the SFMTA has been exploring options to reconfigure the Upper Clipper Street lanes and parking in response to community requests for traffic calming. After reviewing various design option
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Upper Clipper Street Traffic Calming Project Share this: Facebook Twitter LinkedIn Project Introduction Clipper Street will be repaved by San Francisco Public Works in late 2017. In coordination with this effort, the SFMTA has been exploring options to reconfigure the Upper Clipper Street lanes and parking in response to community requests for traffic calming. After reviewing various design options, community response, and upper Clipper’s safety record, the SFMTA plans to implement traffic safety improvements that keep the center turn lane and retain all existing parking. Project Status Completed Improvements Pedestrian Improvements Bicycle Improvements Improved Pavement Bus Routes and Rail Lines 48 Quintara/24th Street Neighborhoods Noe Valley Diamond Heights Twin Peaks Clipper Street between Douglass Street and Diamond Heights Boulevard has historically been a multi-lane arterial street with a 35 MPH speed limit and comparatively high vehicle speeds. In response to resident requests for traffic calming, in 2008 a road diet reduced this section of Clipper from 4 lanes to 3 lanes and added bike lanes. After the 2008 road diet, the safety record on Clipper improved with only 3 total reported collisions between 2008 and 2014. Community requests to calm traffic have continued and the SFMTA is now proposing the following improvements: Reduce lane widths Discourage the use of the turn lane for illegal passing by limiting access to the center turn lane to eastbound driveway access/egress Installing painted buffers between travel lanes and bike lanes Adding safe hit posts to prevent eastbound motorists from driving in the bike lane below the curve at Grandview Project Area This project will take place on Clipper Street between Douglass Street and Diamond Heights Boulevard. Clipper Street looking downhill at Grand View intersection with protected bikeway - February 2020 Clipper Street looking downhill with protected bikeway - February 2020 Clipper Street looking uphill with protected bikeway - February 2020 Contact Information Nick Carr nick.carr@sfmta.com |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
