logo
ProjectClosed

UPPER EGYPT DRAINAGE II

One of 989 projects Taiyo tracks in Egypt, Arab Republic of.

Source: World Bank Group

The Second Upper Egypt Drainage Project works will include: (a) installation of about 50,000 km of buried field drains of PVC corrugated pipes and 6,000 km of buried field collectors of cement pipes in the selected areas totalling 500,000 feddans; (b) deepening and widening of about 1,226 km of existing, and excavation of about 346 km of new open drains, involving approximately 23 million cubic me

Status
Closed
Sector
Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government
Location
Egypt
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about UPPER EGYPT DRAINAGE II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “UPPER EGYPT DRAINAGE II” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Second Upper Egypt Drainage Project works will include: (a) installation of about 50,000 km of buried field drains of PVC corrugated pipes and 6,000 km of buried field collectors of cement pipes in the selected areas totalling 500,000 feddans; (b) deepening and widening of about 1,226 km of existing, and excavation of about 346 km of new open drains, involving approximately 23 million cubic meters of excavation; (c) construction of one pumping station of a capacity of 3.5 cubic meters per second, including transmission line; (d) reclamation by leaching of about 12,000 feddans of saline soils distributed throughout the area to be drained including subsoiling and gypsum application in about two thirds of this area where soils are alkaline; (e) extension of the Government's bilharzia control program by about 120,000 feddans abutting the existing program area and between the Asyut and Dairut barrages; and (f) financing the cost overrun on molluscicide procurement under the first Upper Egypt Drainage project.

Original sector

Agriculture, Fishing and Forestry

Location

Country

Egypt

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Raw Materials, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project