logo

UPPER EGYPT DRAINAGE II

Sector: Water Supply and Storage • Location: Egypt, Arab Republic of

Source: World Bank Group

Project
Closed

The Second Upper Egypt Drainage Project works will include: (a) installation of about 50,000 km of buried field drains of PVC corrugated pipes and 6,000 km of buried field collectors of cement pipes in the selected areas totalling 500,000 feddans; (b) deepening and widening of about 1,226 km of existing, and excavation of about 346 km of new open drains, involving approximately 23 million cubic me

Project Information FAQ

Project Information

5 Q
The project “UPPER EGYPT DRAINAGE II” is an infrastructure initiative in the Water Supply and Storage sector, located in Egypt, Arab Republic of. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Upper Egypt Drainage Project works will include: (a) installation of about 50,000 km of buried field drains of PVC corrugated pipes and 6,000 km of buried field collectors of cement pipes in the selected areas totalling 500,000 feddans; (b) deepening and widening of about 1,226 km of existing, and excavation of about 346 km of new open drains, involving approximately 23 million cubic meters of excavation; (c) construction of one pumping station of a capacity of 3.5 cubic meters per second, including transmission line; (d) reclamation by leaching of about 12,000 feddans of saline soils distributed throughout the area to be drained including subsoiling and gypsum application in about two thirds of this area where soils are alkaline; (e) extension of the Government's bilharzia control program by about 120,000 feddans abutting the existing program area and between the Asyut and Dairut barrages; and (f) financing the cost overrun on molluscicide procurement under the first Upper Egypt Drainage project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data