logo

Upper Karnali Hydro Electric Power Project

Sector: Hydro • Location: Nepal

Source: The Economic Times

Project
Cancelled

IREDA shares are in focus after the Reserve Bank of India (RBI) rejected its proposal for equity investment in the 900 MW Upper Karnali Hydro Electric Power Project in Nepal.

Status
Failure
Sector
Hydro, Power Generation (CCGT), Government
Location
Nepal
Updated
22 Jul 2026
Source
The Economic Times

ConstructChat

Ask ConstructChat about Upper Karnali Hydro Electric Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Upper Karnali Hydro Electric Power Project” is an infrastructure initiative in the Hydro sector, located in Nepal. Taiyo aggregates data on it from The Economic Times.

Participants

Sponsoring Agency

Status

Original status

Cancelled

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

IREDA shares are in focus after the Reserve Bank of India (RBI) rejected its proposal for equity investment in the 900 MW Upper Karnali Hydro Electric Power Project in Nepal.

Original sector

Energy

Location

Country

Nepal

Source

Source

The Economic Times

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT), Government

Article published date

2025-03-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project