Upper Karnali Hydro Electric Power Project
Sector: Power Generation (CCGT) • Location: Nepal
Source: The Economic Times
The Upper Karnali Hydro Electric Power Project is a 900 MW hydroelectric project in Nepal, for which IREDA sought to invest equity. The project is in partnership with GMR Upper Karnali Hydro Power Limited and SJVN, and IREDA plans to resubmit its investment proposal after the RBI's rejection.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- The Economic Times
ConstructChat
Ask ConstructChat about Upper Karnali Hydro Electric Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Upper Karnali Hydro Electric Power Project is a 900 MW hydroelectric project in Nepal, for which IREDA sought to invest equity. The project is in partnership with GMR Upper Karnali Hydro Power Limited and SJVN, and IREDA plans to resubmit its investment proposal after the RBI's rejection. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | The Economic Times |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
