Upper Karnali Hydro Project
One of 10,000+ projects Taiyo tracks in Nepal.
Source: The Economic Times
The Upper Karnali Hydro Project is a 900 MW hydroelectric project in Nepal, for which IREDA sought to invest equity. The project involves a joint venture with GMR Upper Karnali Hydro Power Limited and aims to enhance renewable energy production in the region. IREDA plans to resubmit its investment proposal after the RBI's rejection.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- The Economic Times
ConstructChat
Ask ConstructChat about Upper Karnali Hydro Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Upper Karnali Hydro Project is a 900 MW hydroelectric project in Nepal, for which IREDA sought to invest equity. The project involves a joint venture with GMR Upper Karnali Hydro Power Limited and aims to enhance renewable energy production in the region. IREDA plans to resubmit its investment proposal after the RBI's rejection. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | The Economic Times |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Hydro |
Article published date | 2025-03-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
