Upper Karnali Hydropower Project
The owner, status and timeline of this project. A free account opens every field.
Source: Moneycontrol
The Upper Karnali Hydropower Project is a proposed 900 MW hydropower project in Nepal. The Indian Renewable Energy Development Agency Ltd (IREDA) sought equity investment for its development, but the Reserve Bank of India (RBI) rejected this request, leading to a drop in IREDA's shares.
- Status
- Failure
- Sector
- Hydro
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- Moneycontrol
ConstructChat
Ask ConstructChat about Upper Karnali Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Cancelled |
Taiyo status | Failure |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Upper Karnali Hydropower Project is a proposed 900 MW hydropower project in Nepal. The Indian Renewable Energy Development Agency Ltd (IREDA) sought equity investment for its development, but the Reserve Bank of India (RBI) rejected this request, leading to a drop in IREDA's shares. |
Location
Country | Nepal |
Source
Source | Moneycontrol |
URL |
More Details
Record type | Project |
Sector | Hydro |
Article published date | 2025-03-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
