Upper Mattese Trunk Sanitary Relief
Sector: Water Supply and Storage • Location: Saint Louis, Missouri, United States of America
Source: Dodge USA
Contract consists of the construction of approximately 14,773 lineal feet of pipe sewers, varying in size from 8 to 36 in diameter, including 578 lineal feet of 21 to 30 pipe-in-tunnel, and appurtenances to be constructed.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Tunnel
- Location
- Saint Louis, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Upper Mattese Trunk Sanitary Relief
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contract consists of the construction of approximately 14,773 lineal feet of pipe sewers, varying in size from 8 to 36 in diameter, including 578 lineal feet of 21 to 30 pipe-in-tunnel, and appurtenances to be constructed. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Saint Louis |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Government, Tunnel |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
