Upper Pearl Hill Bridge Replacement
Start · Washington · Last reported Jul 2024
Source: Dodge USA
The construction of Upper Pearl Hill Bridge Replacement , consisting of removing the existing steel and timber bridge and by constructing a prestressed concrete girder bridge, excavation and reconstruction of the existing roadway and stream channel, grading, HMA pavement, storm drains, guardrail, pavement marking, temporary stream diversion, dewatering, temporary erosion and sediment control, and
- Status
- Under Construction
- Sector
- Forest Products and Packaging, Bridge, Cement, Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment
- Location
- East Wenatchee, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Upper Pearl Hill Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of Upper Pearl Hill Bridge Replacement , consisting of removing the existing steel and timber bridge and by constructing a prestressed concrete girder bridge, excavation and reconstruction of the existing roadway and stream channel, grading, HMA pavement, storm drains, guardrail, pavement marking, temporary stream diversion, dewatering, temporary erosion and sediment control, and new guide walls comprised of structural earth walls, and other work. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | East Wenatchee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Forest Products and Packaging, Bridge, Cement, Road, Steel, Government, Metal, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Forest Products and Packaging projects in United States of America
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- CS 560/PINE STREET IN LUMBER CITY - TIA
- RENWICK STREET FROM W RAILROAD STREET TO JONES STREET - TIA
- Paper Work
- 2501 Garden Highway Garage
- CR 473/SWAMP ROAD @ GUM SWAMP
- CR 265/PAPER MILL RD FM CR 244/SPRING LAKE TO CS 967/EZZARD
- Cooperative Agreement for Odometer Fraud Investigations
