Upper Pen Ganga Project
One of 10,000+ projects Taiyo tracks in Maharashtra.
Source: India Investment Grid (IIG)
Information Department of water resources-MH - II has come up with Upper Pen Ganga Project with a ticket size of 1511.83 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and priorit
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT)
- Location
- Yavatmal, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Upper Pen Ganga Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Department of water resources-MH - II has come up with Upper Pen Ganga Project with a ticket size of 1511.83 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. The project envisages utilization of about 33.355 TMC of water potential available from Penganga as well as its tributary, the Kayadhu river, The Project components are as follows [i] Construction of an earthen dam namely Isapur Dam having a length of 3870 m and maximum height of 47 m across the Penganga river with gross storage of 1241.43 M. cum. And live storage as 958.43 cum. [ii] Sapli Dam across Kayadhu river, 2946 m long and maximum height 20.795 m has been proposed near village Sapli Taluka Kalamnuri Dist. Hingoli, with Gross storage as 241.355 M. cum & live storage as 198.78 M. Cum. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 722.93 crore Eligible Central Assistance was Rs 241.966 crore CA released since 2016 till June 2023- 500.71 crore State Share released through NABARD under LTIF till October 2021- Rs 397.73 crore Physical progress- 93.70 percentage Financial Progress- 89.48 percentage Ultimate Irrigation Potential is 44470 Ha Irrigation Potential created till June 2023- 41587 Ha Projected Date of Completion- March 2024 |
Original sector | Water Resources |
Procurement method | |
Budget |
Location
Country | India |
State | Maharashtra |
City | Yavatmal |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Power Transmission, Road, Government, Power Generation (CCGT) |
Article published date | 2024-03-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Nathpa Jhakri India Hydroelectric Power Plant
- Luhri StageI Hydroelectric Project Himachal Pradesh India
- Lower Subansiri Hydroelectric Power Project
