Upper Play Yard Asphalt Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The contractor shall grind approximately 1,000 linear feet around concrete edges, drains and other marked areas at 3.5 inches thick and 12? to 16? feet wide all areas are marked with orange paint. The contractor shall replace 3-yard boxes brooks style. The contractor shall remove and replace approximately 360 SQ FT of damaged asphalt next to the grass field. Contract shall overlay approximately 60
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Road, Car parking, Automotive, Commercial, Consumer Products, Cement, Government, Waste Processing and Treatment
- Location
- Tujunga, California, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Upper Play Yard Asphalt Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The contractor shall grind approximately 1,000 linear feet around concrete edges, drains and other marked areas at 3.5 inches thick and 12? to 16? feet wide all areas are marked with orange paint. The contractor shall replace 3-yard boxes brooks style. The contractor shall remove and replace approximately 360 SQ FT of damaged asphalt next to the grass field. Contract shall overlay approximately 60,000 SQ FT of playground at 2? thick. Contractor shall apply two coats of sealcoat, Diversified o... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Tujunga |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Car parking, Automotive, Commercial, Consumer Products, Cement, Government, Waste Processing and Treatment |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
