Upper Qu'appelle River Channel Improvements
One of 10,000+ projects Taiyo tracks in Saskatchewan.
Source: Dodge USA
The proposed work for 2022 is associated with work near Eyebrow Lake. Dyke repair work is located downstream of the Qu Appelle Rive Dam. The work includes the alteration of the Eyebrow Lake Check structure to a Rock Riffle structure. The alteration will include the removal of four existing culverts and associated infrastructure as well as breaching the riverbank to allow back water into Eyebrow La
- Status
- Closed
- Sector
- Hydro, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- 15 Wing Moose Jaw, Saskatchewan, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Upper Qu'appelle River Channel Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed work for 2022 is associated with work near Eyebrow Lake. Dyke repair work is located downstream of the Qu Appelle Rive Dam. The work includes the alteration of the Eyebrow Lake Check structure to a Rock Riffle structure. The alteration will include the removal of four existing culverts and associated infrastructure as well as breaching the riverbank to allow back water into Eyebrow Lake. The dyke repair work will be located down stream of the Qu Appelle River Dam near Tugaske, Sa... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Saskatchewan |
City | 15 Wing Moose Jaw |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Hydro, Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2023-05-05 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
