logo
ProjectCompleted

Upper Rawakhola Hydropower Project

Completed · Nepal · Last reported Mar 2025

Source: myRepublica

The Upper Rawakhola Hydropower Project has resumed operations after a deal was reached to provide compensation to locals of Kepilasgadhi Rural Municipality, who had previously obstructed its operation due to compensation demands.

Status
Closed
Sector
Hydro, Power Generation (CCGT)
Location
Khotang, Nepal
Updated
22 Jul 2026
Source
myRepublica

ConstructChat

Ask ConstructChat about Upper Rawakhola Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Upper Rawakhola Hydropower Project” is an infrastructure initiative in the Hydro sector, located in Khotang, Nepal. Taiyo aggregates data on it from myRepublica.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Upper Rawakhola Hydropower Project has resumed operations after a deal was reached to provide compensation to locals of Kepilasgadhi Rural Municipality, who had previously obstructed its operation due to compensation demands.

Location

Country

Nepal

City

Khotang

Source

Source

myRepublica

URL

More Details

Record type

Project

Sector

Hydro, Power Generation (CCGT)

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project