Upper Res Spillway Paving Construction
Sector: Road • Location: New York, United States of America
Source: Dodge
The project is located at the Blenheim-Gilboa Project of the New York Power Authority. This project consists of paving an approximately 800-foot section of the crest of the Upper Reservoir and 250-foot from the Upper Reservoir crest to the access gate. The paved area of the crest forms the emergency spillway to the Upper Reservoir. Existing asphalt paving is to be milled to maintain the existing e
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
- Location
- New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Upper Res Spillway Paving Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is located at the Blenheim-Gilboa Project of the New York Power Authority. This project consists of paving an approximately 800-foot section of the crest of the Upper Reservoir and 250-foot from the Upper Reservoir crest to the access gate. The paved area of the crest forms the emergency spillway to the Upper Reservoir. Existing asphalt paving is to be milled to maintain the existing elevations. Refer to Elevations listed below and to drawing attached. New asphalt paving to match ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | New York |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government |
Article published date | 2025-10-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
