Upper Sileru Hydropower Plant Pumped Storage Units
Sector: Hydro • Location: Andhra Pradesh, India
Source: Megaproject
GE Vernova has secured an order from Megha Engineering & Infrastructure Ltd (MEIL) to deliver nine 150 MW pumped storage units for the 1.35 GW Upper Sileru hydropower plant in Andhra Pradesh, India. The project will provide large scale energy storage to support grid reliability and renewable integration, and is expected to be completed by 2030.
- Status
- Prospective
- Sector
- Hydro, Energy Storage, Power Generation (CCGT)
- Location
- Andhra Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Megaproject
ConstructChat
Ask ConstructChat about Upper Sileru Hydropower Plant Pumped Storage Units
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | GE Vernova has secured an order from Megha Engineering & Infrastructure Ltd (MEIL) to deliver nine 150 MW pumped storage units for the 1.35 GW Upper Sileru hydropower plant in Andhra Pradesh, India. The project will provide large scale energy storage to support grid reliability and renewable integration, and is expected to be completed by 2030. |
Original sector | Power Plant |
Location
Country | India |
State | Andhra Pradesh |
Source
Source | Megaproject |
URL |
More Details
Record type | Project |
Sector | Hydro, Energy Storage, Power Generation (CCGT) |
Article published date | 2026-05-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
