logo

Upper Sileru Hydropower Plant Pumped Storage Units

Sector: Hydro • Location: Andhra Pradesh, India

Source: The Economic Times

Project
Awarded

GE Vernova will supply nine pumped-storage units of 150 MW each for Megha Engineering & Infrastructures Limited's upcoming 1.35-GW Upper Sileru hydropower plant in Andhra Pradesh, India. The project is expected to be completed by 2030 and will be one of the largest pumped storage hydropower projects in India. GE Vernova's scope includes design, engineering, manufacturing, testing, supply, transpor

Status
Closed
Sector
Hydro, Manufacturing (Industrial)
Location
Andhra Pradesh, India
Updated
22 Jul 2026
Source
The Economic Times

ConstructChat

Ask ConstructChat about Upper Sileru Hydropower Plant Pumped Storage Units

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Upper Sileru Hydropower Plant Pumped Storage Units” is an infrastructure initiative in the Hydro sector, located in Andhra Pradesh, India. Taiyo aggregates data on it from The Economic Times.

Participants

Not available for this record.

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

GE Vernova will supply nine pumped-storage units of 150 MW each for Megha Engineering & Infrastructures Limited's upcoming 1.35-GW Upper Sileru hydropower plant in Andhra Pradesh, India. The project is expected to be completed by 2030 and will be one of the largest pumped storage hydropower projects in India. GE Vernova's scope includes design, engineering, manufacturing, testing, supply, transportation, and supervision of erection, testing, commissioning of the units, and control and governing systems.

Original sector

Energy

Location

Country

India

State

Andhra Pradesh

Source

Source

The Economic Times

URL

More Details

Record type

Project

Sector

Hydro, Manufacturing (Industrial)

Article published date

2026-05-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project