Upper Silver Creek Trail Bridge Replacement
One of 10,000+ projects Taiyo tracks in California.
Source: Dodge USA
Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to replace a failed trail bridge. Project components include modifications and repairs to the existing abutments and design, fabrication, deliver, and installation of a new prefabricated steel truss trail bridge superstructure.
- Status
- Closed
- Sector
- Government, Steel, Manufacturing (Industrial), Bridge, Commercial, Metal
- Location
- Arnold, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Upper Silver Creek Trail Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to replace a failed trail bridge. Project components include modifications and repairs to the existing abutments and design, fabrication, deliver, and installation of a new prefabricated steel truss trail bridge superstructure. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Arnold |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Government, Steel, Manufacturing (Industrial), Bridge, Commercial, Metal |
Article published date | 2024-12-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
