Upper Silver Creek Trail Bridge Replacement
Sector: Steel • Location: Arnold, California, United States of America
Source: Dodge
Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to replace a failed trail bridge. Project components include modifications and repairs to the existing abutments and design, fabrication, deliver, and installation of a new prefabricated steel truss trail bridge superstructure.
- Status
- Prospective
- Sector
- Steel, Bridge, Commercial, Manufacturing (Industrial), Metal
- Location
- Arnold, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Upper Silver Creek Trail Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Southwest Zone, Contract Service Area 6, on behalf of Region 5, is currently preparing a solicitation RFP to replace a failed trail bridge. Project components include modifications and repairs to the existing abutments and design, fabrication, deliver, and installation of a new prefabricated steel truss trail bridge superstructure. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Arnold |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Bridge, Commercial, Manufacturing (Industrial), Metal |
Article published date | 2025-01-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
