Upper Tamakoshi Hydropower Project
The status, timeline and source of this project. A free account opens every field.
Source: myRepublica
The Upper Tamakoshi Hydropower Project is now ready to operate at its full capacity of 456 MW after undergoing necessary repairs following a prolonged shutdown due to landslides. The project was partially recommissioned on December 24 and is poised to generate electricity during peak demand periods.
- Status
- Closed
- Sector
- Hydro, Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Kathmandu, Nepal
- Updated
- 22 Jul 2026
- Source
- myRepublica
ConstructChat
Ask ConstructChat about Upper Tamakoshi Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Upper Tamakoshi Hydropower Project is now ready to operate at its full capacity of 456 MW after undergoing necessary repairs following a prolonged shutdown due to landslides. The project was partially recommissioned on December 24 and is poised to generate electricity during peak demand periods. |
Location
Country | Nepal |
City | Kathmandu |
Source
Source | myRepublica |
URL |
More Details
Record type | Project |
Sector | Hydro, Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
