logo
ProjectCompleted

Upper Tamakoshi Hydropower Project

The status, timeline and source of this project. A free account opens every field.

Source: myRepublica

The Upper Tamakoshi Hydropower Project is now ready to operate at its full capacity of 456 MW after undergoing necessary repairs following a prolonged shutdown due to landslides. The project was partially recommissioned on December 24 and is poised to generate electricity during peak demand periods.

Status
Closed
Sector
Hydro, Manufacturing (Industrial), Power Generation (CCGT)
Location
Kathmandu, Nepal
Updated
22 Jul 2026
Source
myRepublica

ConstructChat

Ask ConstructChat about Upper Tamakoshi Hydropower Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Upper Tamakoshi Hydropower Project” is an infrastructure initiative in the Hydro sector, located in Kathmandu, Nepal. Taiyo aggregates data on it from myRepublica.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Upper Tamakoshi Hydropower Project is now ready to operate at its full capacity of 456 MW after undergoing necessary repairs following a prolonged shutdown due to landslides. The project was partially recommissioned on December 24 and is poised to generate electricity during peak demand periods.

Location

Country

Nepal

City

Kathmandu

Source

Source

myRepublica

URL

More Details

Record type

Project

Sector

Hydro, Manufacturing (Industrial), Power Generation (CCGT)

Article published date

2025-01-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project