Upper Tatay Hydropower Station
The status, timeline and source of this project. A free account opens every field.
Source: Center for Strategic and International Studies (CSIS)
The Upper Tatay Hydropower Station is a cascade station of the Tatay Hydropower Station in Cambodia, with a designed capacity of 150 MW. It is being built by Sinomach and is set to be completed in 2027 to help with flood control.
- Status
- Under Construction
- Sector
- Hydro
- Location
- Cambodia
- Updated
- 22 Jul 2026
- Source
- Center for Strategic and International Studies (CSIS)
ConstructChat
Ask ConstructChat about Upper Tatay Hydropower Station
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Upper Tatay Hydropower Station is a cascade station of the Tatay Hydropower Station in Cambodia, with a designed capacity of 150 MW. It is being built by Sinomach and is set to be completed in 2027 to help with flood control. |
Original sector | Energy |
Location
Country | Cambodia |
Source
Source | Center for Strategic and International Studies (CSIS) |
URL |
More Details
Record type | Project |
Sector | Hydro |
Article published date | 2025-12-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
