logo
ProjectUnder Construction

Upper Tatay Hydropower Station

The status, timeline and source of this project. A free account opens every field.

Source: Center for Strategic and International Studies (CSIS)

The Upper Tatay Hydropower Station is a cascade station of the Tatay Hydropower Station in Cambodia, with a designed capacity of 150 MW. It is being built by Sinomach and is set to be completed in 2027 to help with flood control.

Status
Under Construction
Sector
Hydro
Location
Cambodia
Updated
22 Jul 2026
Source
Center for Strategic and International Studies (CSIS)

ConstructChat

Ask ConstructChat about Upper Tatay Hydropower Station

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Upper Tatay Hydropower Station” is an infrastructure initiative in the Hydro sector, located in Cambodia. Taiyo aggregates data on it from Center for Strategic and International Studies (CSIS).

Participants

Company

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Upper Tatay Hydropower Station is a cascade station of the Tatay Hydropower Station in Cambodia, with a designed capacity of 150 MW. It is being built by Sinomach and is set to be completed in 2027 to help with flood control.

Original sector

Energy

Location

Country

Cambodia

Source

Source

Center for Strategic and International Studies (CSIS)

URL

More Details

Record type

Project

Sector

Hydro

Article published date

2025-12-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project