logo

Upper Trishuli-1 Hydropower Plant

Sector: Water Supply and Storage • Location: Nepal

Source: World Bank Group

Project
Active

The project involves the development, construction, operation and maintenance of 216MW Upper Trishuli-1 Hydropower plant on the Trishuli River near Nepal's capital, Kathmandu. The energy will be sold to the national utility Nepal Electricity Authority under a 30-year PPA. The SPV Nepal Water and Energy Development Company Pvt Ltd (NWEDC) is owned as follows: 50% by Korea South-East Power Co., Ltd.

Project Information FAQ

Project Information

4 Q
The project “Upper Trishuli-1 Hydropower Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Nepal. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development, construction, operation and maintenance of 216MW Upper Trishuli-1 Hydropower plant on the Trishuli River near Nepal's capital, Kathmandu. The energy will be sold to the national utility Nepal Electricity Authority under a 30-year PPA. The SPV Nepal Water and Energy Development Company Pvt Ltd (NWEDC) is owned as follows: 50% by Korea South-East Power Co., Ltd., 15% by Daelim Industrial Co. Ltd., 10% by Kyeryong Construction Industrial Co., Ltd and 10% by Nepali locals. IFC holds 15% stake in NWEDC via a $4.25 million equity investment made in 2013 through IFC InfraVentures, an early-stage project development fund. NWEDC will develop the plant under Build, Own, Operate and Transfer model under a 35-year concession agreement with the Government of Nepal represented by the Ministry of Energy, Water Resources and Irrigation. The Project cost is estimated at about $647.2 million. Asian Development Bank (ADB) has signed a $60 million financing package comprising of a $30 million loan from ADB and a $30 million loan from the ADB-administered Canadian Climate Fund for the Private Sector in Asia II (CFPS II). $161 million ($66 million loan and $95 million blended finance facility) by International Finance Corporation; $100 million by Export–Import Bank of Korea; $30.8 million by Korea Development Bank (KDB); $39.6 million by Asian Infrastructure Investment Bank; $22 million by Commonwealth Development Corporation (CDC Group); $15.4 million by FMO (Nederlandse Financierings-Maatschappij Voor Ontwikkelingslanden); $13.2 million by OPEC Fund for International Development; and $11 million by Proparco. MIGA provided $135 million guarantees against the risk of breach of contract. Korea Trade Insurance Corp is ensuring KDB's tranche. Debt financing was signed on 1 November 2019. The plan? is expected to be commissioned in March 2024. https://www.adb.org/projects/49086-001/main#project-overview https://ijglobal.com/data/transaction/31873?name=Upper%20Trishuli%20Hydro%20Power%201%20(216MW)%20IPP&link=%2Farticles%2F143481%2Fupdate-debt-financing-for-216mw-nepali-hydro https://nwedcpl.com/project/projectsummary https://www.miga.org/project/upper-trishuli-1-hydropower-project https://kathmandupost.com/money/2019/07/17/developer-of-upper-trishuli-1-sees-funding-oversubscription-by-178-million-near-financial-closure https://disclosures.ifc.org/#/projectDetail/SII/35701 https://www.proparco.fr/en/actualites/ifc-partners-provide-more-450-million-support-major-hydro-electric-plant-nepal?origin=/en/actualites?field_date_value=&field_date_value_1=&field_type_target_id=All&field_region_country_target_id=All&field_theme_target_id=All&items_per_page=5&page=2 https://www.fmo.nl/news-detail/2dc6337a-145d-4eb0-b298-76cf4be50d03/fmo-contributes-to-us-450m-package-in-support-of-major-hydro-electric-plant-in-nepal

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data