Upper Trishuli-1 Hydropower Project
Sector: Water Supply and Storage • Location: Nepal
Source: Asian Development Bank (ADB)
The project comprises the design, construction, commissioning, operation and maintenance of a 216 MW run-of-river hydro power plant, 1.2 kilometers of transmission lines, and associated infrastructure on the Trishuli River. The electricity generated will be sold for domestic consumption to the Nepal Electricity Authority.
- Sector
- Water Supply and Storage, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial), Government, Hydro, Commercial, Road
- Location
- Nepal
- Updated
- 22 Jul 2026
- Source
- Asian Development Bank (ADB)
ConstructChat
Ask ConstructChat about Upper Trishuli-1 Hydropower Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project comprises the design, construction, commissioning, operation and maintenance of a 216 MW run-of-river hydro power plant, 1.2 kilometers of transmission lines, and associated infrastructure on the Trishuli River. The electricity generated will be sold for domestic consumption to the Nepal Electricity Authority. |
Original sector | Energy |
Budget |
Location
Country | Nepal |
Source
Source | Asian Development Bank (ADB) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial), Government, Hydro, Commercial, Road |
Article published date | 2024-09-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
