Upper Trishuli-1

One of 10,000+ projects Taiyo tracks in Nepal.

Source: IFC Project Disclosures

   Upper Trishuli 1 (“UT1” or the “Project”) is a proposed 216 MW greenfield run of river hydropower project located on the Upper Trishuli river in Nepal. The project is being developed by a Nepalese special purpose vehicle, Nepal Water & Energy Development Company Pvt. Ltd. (“NWEDC” or the “Company”).  The project will sell power to Nepal Electricity Authority (“NEA”), the

Status
Prospective
Sector
Road, Power Transmission, Hydro, Power Generation (CCGT), Water Supply and Storage, Government
Location
Nepal
Updated
19 Nov 2026
Source
IFC Project Disclosures

ConstructChat

Ask ConstructChat about Upper Trishuli-1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Upper Trishuli-1” is an infrastructure initiative in the Road sector, located in Nepal. Taiyo aggregates data on it from IFC Project Disclosures.

Participants

Not available for this record.

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

   Upper Trishuli 1 (“UT1” or the “Project”) is a proposed 216 MW greenfield run of river hydropower project located on the Upper Trishuli river in Nepal. The project is being developed by a Nepalese special purpose vehicle, Nepal Water & Energy Development Company Pvt. Ltd. (“NWEDC” or the “Company”).  The project will sell power to Nepal Electricity Authority (“NEA”), the national utility, for domestic supply under a 30-year power purchase agreement (“PPA”).  The project will be developed on a Build, Own, Operate and Transfer (“BOOT”) basis under a 35-year concession agreement (Project Development Agreement or “PDA”) with the Government of Nepal’s (“GoN”) Ministry of Energy (“MOE”). If constructed, UT-1 will be one of the largest Foreign Direct Investment (“FDI”) in Nepal to date, increasing the country’s domestic power supply by approximately one-third compared to 2018 levels and providing about 40% of its expected 1,427 GWh of annual output during the dry season, which includes the peak winter demand months. The project’s expected commissioning date is October 2024.The project consists of a 100.9-m-wide and 29.5-m high diversion dam in a narrow gorge located in the Trishuli River 275 m downstream of the confluence of the Langtang Khola (tributary) with the Bhote Khosi River, about 70 km to the north-east of Kathmandu. The diversion dam will create a small 2.1 ha impoundment and divert, via two intake tunnels each with a gate size of 3.35 x 6.50 meters and a total length of approximately 285 meters,  up to 76 m3/s of water through a powerhouse with a 216 MW capacity, returning the water to the Trishuli River approximately 10.7 km downstream of the dam. The project is designed to operate continuously as a run-of-river facility and will connect to a new Chilime–Trishuli transmission line via a 1.1-km long, high voltage extension from the UT-1 take-off yard. The Chilime-Trishuli line is being constructed for the purposes of linking several existing and planned upstream hydropower projects into the grid and has therefore not been identified as an Associated Facility to the UT-1 project according to IFC PS 1 requirements. The project will be accessed via existing public roads, but NWEDC is in the process of constructing an 11.84 km access road on the right bank of the river to link the dam and powerhouse locations. Project construction will also require the establishment of five worker camps (3 for workers and 2 for EPC staff - with associated accommodations, diesel power generation sets, fuel storage, water and wastewater treatment plants), four quarries, one crushing plant, three batch plants, several construction/equipment yards, and nine spoil disposal areas. It is noteworthy that social impact assessment and mitigation were substantially complicated by an earthquake in 2015 which devastated the project area and scattered the inhabitants of ten directly affected settlements across a range of internally displaced persons’ camps, where some of them still reside. The earthquake also impacted project ESIA timelines and findings and led to a protracted series of studies and follow-up surveys over the course of three and a half years.Early disclosure of draft Updated ESIA documentation took place on March 23rd, 2018; and after review and comments by multiple stakeholder including the broader Lenders’ group, it is now disclosed in its final form together with this ESRS and ESAP.                                                

Original sector

V-BA - Large Hydro - Renewable Energy Generation

Location

Country

Nepal

Source

Source

IFC Project Disclosures

URL

More Details

Record type

Project

Sector

Road, Power Transmission, Hydro, Power Generation (CCGT), Water Supply and Storage, Government

Article published date

2026-09-09

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project