logo

Upper Trishuli-1

Sector: Residential • Location: Nepal

Source: International Finance Corporation (IFC)

Project
Active

 Upper Trishuli 1 is a 216 MW run of river hydropower project on the Upper Trishuli river in Nepal (“UT1” or the “Project”), owned by a special purpose vehicle, Nepal Water & Energy Development Corporation (“NWEDC” or the “Company”) established under the laws of Nepal.  NWEDC is majority-owned by Korean sponsors: 50% by Korea South East Power Company (“KOEN”), 15% by Daelim Industrial Co. Ltd. (“D

Project Information FAQ

Project Information

5 Q
The project “Upper Trishuli-1” is an infrastructure initiative in the Residential sector, located in Nepal. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

 Upper Trishuli 1 is a 216 MW run of river hydropower project on the Upper Trishuli river in Nepal (“UT1” or the “Project”), owned by a special purpose vehicle, Nepal Water & Energy Development Corporation (“NWEDC” or the “Company”) established under the laws of Nepal.  NWEDC is majority-owned by Korean sponsors: 50% by Korea South East Power Company (“KOEN”), 15% by Daelim Industrial Co. Ltd. (“Daelim”) and 10% by Kyeryong Construction Industrial Co. Ltd. (“Kyeryong”) (KOEN, Daelim and Kyeryong are together the “Sponsors”). Through IFC InfraVentures, IFC has been co-developing the Project with a 15% stake since 2012. The local partner is Mr. Bkesh Pradhanang, the original developer/license holder, with a 10% shareholding.  IFC is considering providing an A loan of up to US$90 million, mobilizing the remaining debt required for the Project as B loans/parallel loans, and providing equity to maintain its 15% shareholding in the Company.  The Project is expected to be the largest foreign direct investment in Nepal to date and will sell power to Nepal Electricity Authority (“NEA”), the national utility, for domestic supply under a 35-year power purchase agreement (“PPA”).  The Project will be developed on a Build, Own, Operate and Transfer (“BOOT”) basis under a 35-year concession agreement (Project Development Agreement or “PDA”) with the Government of Nepal’s (“GoN”) Ministry of Energy (“MOE”), signed in December 2016 Client’s Contact Information:NWEDC OFFICE, KATHMANDU, NEPAL-   Tel : +977 1 441 2229 /+977 1 441 2257 ,  FAX : +977 1 442 2775Mr. Bo Seuk Yi (CEO)-          Cell : +977 980 102 7111, E-mail : yikmhhyh@naver.comMr. Joon-hyung Kim (Managerial Director) -   Cell  : +977 980 102 9222, E-mail : hyung9304@gmail.com4.Mr. Ashok Baniya (E & S Manager)-   Cell : +977 984 356 1308,  E-mail : ashok.baniya@nwedc.com.np 

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data