Upper Wildwood Creek Basin 4
Sector: Water Supply and Storage • Location: Oak Glen, California, United States of America
Source: Dodge USA
Upper Wildwood Creek Basin 4 - The contract work to be done shall consist of furnishing all labor, materials,necessary tools, equipment, supervision, appurtenances, and all utility andtransportation services required for asphalt concrete pavement, site grading toinclude export, concrete v-ditch, concrete drainage structures, grouted andungrouted riprap, RCP storm drain, CMB access road/ramp, DG pa
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Steel, Government, Mass Transit, Rail, Commercial, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT), Metal
- Location
- Oak Glen, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Upper Wildwood Creek Basin 4
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Upper Wildwood Creek Basin 4 - The contract work to be done shall consist of furnishing all labor, materials,necessary tools, equipment, supervision, appurtenances, and all utility andtransportation services required for asphalt concrete pavement, site grading toinclude export, concrete v-ditch, concrete drainage structures, grouted andungrouted riprap, RCP storm drain, CMB access road/ramp, DG paths and trail construction, tubular steel posts, fence and gate construction, grading and drainag... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Oak Glen |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Steel, Government, Mass Transit, Rail, Commercial, Waste Processing and Treatment, Power Transmission, Road, Power Generation (CCGT), Metal |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
