UPPTCL 400 KV DC Twin Moose Banda Chitrakoot Transmission Line Project
Sector: Manufacturing (Industrial) • Location: Uttar Pradesh, India
Source: Entrepreneur
Salasar Techno Engineering Limited secured a turnkey transmission line project from Uttar Pradesh Power Transmission Corporation Limited (UPPTCL) to execute a 400 KV DC Twin Moose transmission line spanning approximately 130 kilometres, connecting Banda and Chitrakoot districts in Uttar Pradesh. The scope includes engineering, detailed design, supply of equipment and materials, erection, testing,
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT), Government
- Location
- Uttar Pradesh, India
- Updated
- 22 Jul 2026
- Source
- Entrepreneur
ConstructChat
Ask ConstructChat about UPPTCL 400 KV DC Twin Moose Banda Chitrakoot Transmission Line Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Salasar Techno Engineering Limited secured a turnkey transmission line project from Uttar Pradesh Power Transmission Corporation Limited (UPPTCL) to execute a 400 KV DC Twin Moose transmission line spanning approximately 130 kilometres, connecting Banda and Chitrakoot districts in Uttar Pradesh. The scope includes engineering, detailed design, supply of equipment and materials, erection, testing, and final commissioning. The project aims to strengthen power transmission infrastructure, enhance grid stability, improve electricity supply reliability, reduce technical transmission losses, and support increasing power demand due to industrial expansion and urbanisation. |
Original sector | Power Transmission |
Budget |
Location
Country | India |
State | Uttar Pradesh |
Source
Source | Entrepreneur |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT), Government |
Article published date | 2025-12-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
