Uranium Processing Facility, Oak Ridge, Tennessee
Sector: Advanced Electronics • Location: United States of America
Source: Bechtel
Uranium Processing Facility,Enabling the future of America's nuclear security mission
Nuclear security is a national and international imperative. In the United States, that responsibility belongs to the National Nuclear Security Administration (NNSA), and the first of its four missions is to maintain and safeguard America’s nuclear stockpile. A critical project in that mission is the Uranium Pro
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Uranium Processing Facility,Enabling the future of America's nuclear security mission Nuclear security is a national and international imperative. In the United States, that responsibility belongs to the National Nuclear Security Administration (NNSA), and the first of its four missions is to maintain and safeguard America’s nuclear stockpile. A critical project in that mission is the Uranium Processing Facility at the Y-12 National Security Complex in the state of Tennessee, which has played a key role in strengthening our country’s nuclear defense and reducing the global threat from weapons of mass destruction. Originally built 75 years ago during the Manhattan Project, Y-12’s uranium facilities are dated and deteriorating. NNSA has partnered with Bechtel to deliver a modern facility with a design life of at least 50 years to ensure the long-term viability, safety, and security of those capabilities in the United States. The modernization will also improve worker safety, reduce energy consumption and significantly lower operating and maintenance costs. It is one of NNSA's largest construction projects. Image gallery Economic impact It is estimated that more than $1.8 billion will be spent on goods and services to build the new multi-facility complex, and more than 2,000 jobs will be created at peak construction. To expedite progress and take advantage of available expertise, the design work is being conducted at three separate engineering centers in Tennessee and Virginia using a consolidated digital engineering design model. Prework Site Readiness—complete—on time and under budget Site Infrastructure and Services—complete—on time and under budget Substation—complete—ahead of schedule and under budget Ongoing Each of the four main buildings is being constructed around the safety and security requirements appropriate for its function, which provides greater cost-saving opportunities in construction and equipment installation. Mechanical Electrical Building—complete Process Support Facilities—underway Salvage and Accountability Building—underway Main Process Building—underway An image from 2022 showing construction progress on the UPF complex. Two tower cranes, which are 300 and 360 feet tall, were installed in early 2018 as part of the construction of UPF. Having high-capacity, stationary cranes within the footprint of the buildings gives UPF the ability to reach every spot in the construction zone, making materials handling safe and efficient. See the construction status on the Y-12 site. Modern safety standards, security, and flexibility The complex will enable processing capabilities for enriched uranium casting, oxide production, and salvage and accountability operations to support the Nation’s nuclear weapons stockpile, defense nuclear nonproliferation, and naval reactors. Advances in processing will provide significant improvements in safety and efficiency of operations, and space utilization. More than 210,000 cubic yards of concrete will form the foundation and 15,000 tons of structural steel (the Eifflel Tower weighs 11,400 tons) will be used to build the facilities and safeguard their contents and mission from natural and manmade threats. UPF will be also be protected by a state-of-the-art perimeter intrusion detection and assessment system and the highly trained, well-equipped Y-12 guard force. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Advanced Electronics projects in United States of America
- West Bay Yards
- Mushrooms for the Campus Center for Approriate Technology
- East 14th Street
- Southern University Reaching Across the Digital Divide (SURADD): Connecting Minority Communities Pilot
- Meeting the Needs of Underrepresented Communities by Providing Broadband Access and Training
- Missouri Network Alliance dba Bluebird Network MO to OK NTIA MMGP
- Creating Connections: Building Equitable Access to Broadband in Newark through Public-Private Collaborations
- Connecting Broward UP Communities (CBC) Project
