logo

Uranium Processing Facility, Oak Ridge, Tennessee

Sector: Advanced Electronics • Location: United States of America

Source: Bechtel

Project
Close

Uranium Processing Facility,Enabling the future of America's nuclear security mission

Nuclear security is a national and international imperative. In the United States, that responsibility belongs to the National Nuclear Security Administration (NNSA), and the first of its four missions is to maintain and safeguard America’s nuclear stockpile. A critical project in that mission is the Uranium Pro

Project Information FAQ

Project Information

4 Q
The project “Uranium Processing Facility, Oak Ridge, Tennessee” is an infrastructure initiative in the Advanced Electronics sector, located in United States of America. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Uranium Processing Facility,Enabling the future of America's nuclear security mission Nuclear security is a national and international imperative. In the United States, that responsibility belongs to the National Nuclear Security Administration (NNSA), and the first of its four missions is to maintain and safeguard America’s nuclear stockpile. A critical project in that mission is the Uranium Processing Facility at the Y-12 National Security Complex in the state of Tennessee, which has played a key role in strengthening our country’s nuclear defense and reducing the global threat from weapons of mass destruction. Originally built 75 years ago during the Manhattan Project, Y-12’s uranium facilities are dated and deteriorating. NNSA has partnered with Bechtel to deliver a modern facility with a design life of at least 50 years to ensure the long-term viability, safety, and security of those capabilities in the United States.  The modernization will also improve worker safety, reduce energy consumption and significantly lower operating and maintenance costs.  It is one of NNSA's largest construction projects. Image gallery Economic impact It is estimated that more than $1.8 billion will be spent on goods and services to build the new multi-facility complex, and more than 2,000 jobs will be created at peak construction.  To expedite progress and take advantage of available expertise, the design work is being conducted at three separate engineering centers in Tennessee and Virginia using a consolidated digital engineering design model. Prework Site Readiness—complete—on time and under budget Site Infrastructure and Services—complete—on time and under budget Substation—complete—ahead of schedule and under budget Ongoing Each of the four main buildings is being constructed around the safety and security requirements appropriate for its function, which provides greater cost-saving opportunities in construction and equipment installation.  Mechanical Electrical Building—complete Process Support Facilities—underway Salvage and Accountability Building—underway Main Process Building—underway An image from 2022 showing construction progress on the UPF complex. Two tower cranes, which are 300 and 360 feet tall, were installed in early 2018 as part of the construction of UPF. Having high-capacity, stationary cranes within the footprint of the buildings gives UPF the ability to reach every spot in the construction zone, making materials handling safe and efficient. See the construction status on the Y-12 site. Modern safety standards, security, and flexibility The complex will enable processing capabilities for enriched uranium casting, oxide production, and salvage and accountability operations to support the Nation’s nuclear weapons stockpile, defense nuclear nonproliferation, and naval reactors. Advances in processing will provide significant improvements in safety and efficiency of operations, and space utilization. More than 210,000 cubic yards of concrete will form the foundation and 15,000 tons of structural steel (the Eifflel Tower weighs 11,400 tons) will be used to build the facilities and safeguard their contents and mission from natural and manmade threats. UPF will be also be protected by a state-of-the-art perimeter intrusion detection and assessment system and the highly trained, well-equipped Y-12 guard force.  

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data