logo
ProjectClosed

Urban Canyon Apartments / Common Practice + Studio AAAN

Sector: Road

Source: ArchDaily

The collaboration between theAmsterdamand Rotterdam-based architecture firms Common Practice and Studio AAAN came about after winning a competition for young architects. Both firms believe strongly in the significance of the in-between as a place where the private, collective, and public overlap. For this project, they collaborated from concept and masterplan to the elaboration of the typology and

Status
Closed
Sector
Road, Manufacturing (Industrial), Car parking, Residential, Commercial, Warehouse, Automotive
Updated
22 Jul 2026
Source
ArchDaily

ConstructChat

Ask ConstructChat about Urban Canyon Apartments / Common Practice + Studio AAAN

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Urban Canyon Apartments / Common Practice + Studio AAAN” is an infrastructure initiative in the Road sector. Taiyo aggregates data on it from ArchDaily.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The collaboration between theAmsterdamand Rotterdam-based architecture firms Common Practice and Studio AAAN came about after winning a competition for young architects. Both firms believe strongly in the significance of the in-between as a place where the private, collective, and public overlap. For this project, they collaborated from concept and masterplan to the elaboration of the typology and materialization. MIX architectuur designed the parking garage and two buildings with condominiums in the block. Maarten Heijkamp was asked to create artwork for the wall of the courtyard.Text description provided by the architects.In the new urban district onAmsterdam’s Oostenburgereiland, a compact residential ensemble was realized on an exceptionally narrow plot along the blind side wall of a high parking building. Common Practice and Studio AAAN made the masterplan with 64 dwellings around a striking courtyard and designed two apartment buildings with special mid-rent housing, in which as many collective and private spaces as possible have a relationship with the serene courtyard.Within their modest size, the apartments offer a degree of flexibility and spaciousness that makes them feel larger than they really are. An additional sliding door to connect sleeping and living spaces during the day. Additional “half rooms” at the rear can serve as home offices, guest rooms, or baby rooms. Corner windows and transparent loggias allow diagonal views along the front and rear facades, to both the lively city and the mysterious courtyard.The entrance halls to the apartments and collective bicycle storage are located in the gateways and form a continuous urban interior together with the courtyard. The soft undulating plinth continues throughout and makes a connection to the monumental side facade of the garage. This way, the “Urban Canyon” is not only a functional void, providing additional daylight to the dwellings but also a characteristic meeting place that occasionally reveals itself to the street and plays a part in the daily routine of the residents.Within the complex conditions, the plan seeks to find a human scale and a special living experience with various architectural interventions. The mass is divided into four buildings, each with its own entrance hall, typology and character, and at the same time united at the rear around the shared courtyard. The rational composition of grid facades, referring to the industrial past of the area, is differentiated at street level: a plinth with high windows, street-oriented homes, a corner-shop-like community room, and a series of tall gates with vistas to a hidden inner world.

Location

Not available for this record.

Source

Source

ArchDaily

URL

More Details

Record type

Project

Sector

Road, Manufacturing (Industrial), Car parking, Residential, Commercial, Warehouse, Automotive

Article published date

2025-06-10

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project