logo
ProjectClosed

URBAN DEVT.

Sector: Road • Location: Senegal

Source: World Bank Group

The project would include: a) acquisition and preparation of 400 hectares in Dakar and 60 hectares in Thies. Provision would be made for 14,000 lots in Dakar and 1,600 lots in Thies for the construction of dwellings. On the basis of estimated population density of 10 people per lot, the project would accommodate 140,000 people in Dakar and 16,000 in Thies. Land would be reserved for other activiti

Status
Closed
Sector
Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government
Location
Senegal
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about URBAN DEVT.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “URBAN DEVT.” is an infrastructure initiative in the Road sector, located in Senegal. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project would include: a) acquisition and preparation of 400 hectares in Dakar and 60 hectares in Thies. Provision would be made for 14,000 lots in Dakar and 1,600 lots in Thies for the construction of dwellings. On the basis of estimated population density of 10 people per lot, the project would accommodate 140,000 people in Dakar and 16,000 in Thies. Land would be reserved for other activities, including commercial, small-scale industrial, recreational, cultural, and educational facilities; b) extensions to the primary road, water and power networks to and through the project area and the provision of roads, power, water and sanitation facilities within the new settlements; c) the construction of, and equipment for, 14 primary schools, 4 secondary schools and 5 health centers; d) provision of technical assistance for detailed engineering, management and training related to project implementation and the formulation of national housing policy; and e) a study of the criteria for determining whether to relocate squatter settlements or improve them in situ, together with a pilot project for improving 10 hectares of a squatter settlement in situ in the center of Dakar.

Original sector

(Historic)Urban Development

Location

Country

Senegal

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Power Generation (CCGT), Manufacturing (Industrial), Commercial, Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project