logo

URBAN I

Sector: Road • Location: Lesotho

Source: World Bank Group

Project
Closed

The project would include: (i) technical assistance for: a project coordination unit (PCU) in the Ministry of Interior that would be the main project executing agent, and studies for the identification of training needs, and design of administrative and financial systems for the proposed Maseru Municipal Council; and identification of a possible second project; (ii) site preparation and servicing:

Project Information FAQ

Project Information

5 Q
The project “URBAN I” is an infrastructure initiative in the Road sector, located in Lesotho. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project would include: (i) technical assistance for: a project coordination unit (PCU) in the Ministry of Interior that would be the main project executing agent, and studies for the identification of training needs, and design of administrative and financial systems for the proposed Maseru Municipal Council; and identification of a possible second project; (ii) site preparation and servicing: in Khubetsoana, 4.5 km from central Maseru, the development of about 500 residential and 25 small business plots and in the Thamaes, a peri urban area of Maseru, upgrading of 1,300 existing plots and about 1,200 plots (to be created through subdivision of existing plots), including about 25 for small businesses; (iii) home construction and improvement loans: loans ranging from US$298 to US$954 equivalent would be made available to about 1,700 households and about 50 workshops and small businesses; (iv) primary infrastructure: roads, water and street lighting would be provided in the Khubetsoana and Thamaes project areas; (v) community facilities: health clinics and multipurpose community centers would be provided in each project area, and 28 classrooms would be added to existing schools; (vi) maintenance and refuse equipment would be provided to maintain roads.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data