URBAN II
One of 1,535 projects Taiyo tracks in Zimbabwe.
Source: World Bank Group
The project is structured as a sector loan under which the Government will undertake to appraise individual projects in urban areas based on criteria acceptable to both the Government and the Bank. Specifically, the project will: (i) support the provision of primary urban infrastructure, including water supply, sewerage, and roads and drainage, as well as provide for maintenance of related vehicle
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Power Generation (CCGT), Automotive, Waste Processing and Treatment, Commercial, Government, Manufacturing (Industrial)
- Location
- Zimbabwe
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about URBAN II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is structured as a sector loan under which the Government will undertake to appraise individual projects in urban areas based on criteria acceptable to both the Government and the Bank. Specifically, the project will: (i) support the provision of primary urban infrastructure, including water supply, sewerage, and roads and drainage, as well as provide for maintenance of related vehicles and equipment; (ii) support the provision of urban housing for 500,000 people under the next 5 year capital development plan; (iii) introduce a regional development strategy, a corridor town development plan, and district development investment plans; and (iv) strengthen the institutional capacity of central government to appraise proposed projects, and local authorities to perform their functions. |
Original sector | Energy and Extractives,FY17 - Public Administration,FY17 - Social Protection,FY17 - Water, Sanitation and Waste Management,Financial Sector |
Budget |
Location
Country | Zimbabwe |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Power Generation (CCGT), Automotive, Waste Processing and Treatment, Commercial, Government, Manufacturing (Industrial) |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Zimbabwe
- Zimbabwe - Alaska – Karoi Power Transmission Reinforcement Project
- Limpopo Toll Bridge
- Harare - Beitbridge Road Link 4 (Turn Off to Beitbridge Border Post)
- Harare - Beitbridge Road Link 2 (Chivhu to Masvingo)
- Chirundu - Harare Road Link 3 (Karoi to Chinhoyi)
- Chirundu - Harare Road Link 4 (Chinhoyi to Harare)
- Harare - Beitbridge Road Link 3 (Masvingo to Turn Off)
- Chirundu - Harare Road Link 2 (Makuti to Karoi)
