logo
ProjectClosed

Urban Infrastructure & Service Delivery Project

Sector: Water Supply and Storage • Location: Bosnia and Herzegovina

Source: World Bank

The objectives of the Urban Infrastructure and Services Delivery Project are threefold: a) improve the availability, quality, and reliability of basic municipal services, in particular, water supply and sanitation; b) strengthen the ability of cantonal, and municipal governments to improve management, and institutional capacity for infrastructure development through Urban Management Development Pl

Status
Closed
Sector
Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Education, Commercial
Location
Bosnia and Herzegovina
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Urban Infrastructure & Service Delivery Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Urban Infrastructure & Service Delivery Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Bosnia and Herzegovina. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objectives of the Urban Infrastructure and Services Delivery Project are threefold: a) improve the availability, quality, and reliability of basic municipal services, in particular, water supply and sanitation; b) strengthen the ability of cantonal, and municipal governments to improve management, and institutional capacity for infrastructure development through Urban Management Development Plans, and, c) as possible, foster deeper social cohesion, through improvements in living conditions. Project components aim at: 1) supporting financial management, and training to strengthen, and build institutional capacity; drafting annual business plans for each utility; training for the preparation of Urban Management Development Plans. A study on the institutional capacity and Government's role will focus on appropriate capacity building; 2) financing the preparation of Urban Management Development Plans in selected areas, to identify priorities, improving operations and maintenance, and maximizing investment benefits. These Plans would analyze current operational efficiency; detail existing maintenance; identify physical assets to be rehabilitated; and, determine service demands. Also financed will be investments in selected service sectors; 3) financing least-cost priority investments, based on system improvements, lowering energy usage, including related investments to water supply and sanitation utilities. The Utilities will be grouped in three categories: Group A, will consist of three Utilities that have undergone financial, institutional, technical, environmental and social work during project preparation; Group B Utilities, will be expected to reach financial viability, and cover all operation and maintenance costs, by 2009; and, Group C would target areas lacking social cohesion, or affected during the postwar period, provided with small amounts of IDA credit, in addition to grant financing from other donors; 4) financing the planning and design, engineering for the preparation of final designs and bidding documents, and, assistance with procurement and supervision of construction for investments; and, 5) financing incremental operating costs, salaries, audits, as well as guidance and training for Utilities and local governments on project implementation. A stakeholder education campaign on linkages between improved service and willingness to pay, will be supported.

Original sector

FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

Bosnia and Herzegovina

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Government, Education, Commercial

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project