logo

Urban Project Preparatory Facility

Sector: Water Supply and Storage • Location: Sri Lanka

Source: Asian Development Bank (ADB)

Project
Closed

The outputs of the proposed Urban Project Preparatory Facility for Sri Lanka include (i) feasibility studies and detailed designs of urban projects completed; (ii) advance implementation support for two ensuing projects provided; and (iii) institutional capacity of implementing agencies strengthened. The outputs will result in the following outcome: high level of urban project readiness achieved.

Project Information FAQ

Project Information

5 Q
The project “Urban Project Preparatory Facility” is an infrastructure initiative in the Water Supply and Storage sector, located in Sri Lanka. Taiyo aggregates data on it from Asian Development Bank (ADB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The outputs of the proposed Urban Project Preparatory Facility for Sri Lanka include (i) feasibility studies and detailed designs of urban projects completed; (ii) advance implementation support for two ensuing projects provided; and (iii) institutional capacity of implementing agencies strengthened. The outputs will result in the following outcome: high level of urban project readiness achieved. The project will be aligned with the following impact: urban projects in strategic cities and towns implemented in a timely manner. The TA loan will develop two projects listed in the country operations business plan (COBP), 2018-2020. Subproject selection criteria were prepared together with executing agencies, and projects to be developed under the UPPF were initially identified during fact-finding mission. Areas of value addition for ADB include piloting innovative approaches such as high-level technology to improve operational efficiency, reduce greenhouse gas emissions, and address climate change impacts. An attached transaction technical assistance (TA) of $1.0 million funded on a grant basis by ADB's Technical Assistance Special Fund (TASF-6) will provide capacity building and implementation support to the executing agencies in areas of procurement, technical appraisal, safeguards, disaster and climate change, governance improvement, strategic planning, financial management, revenue generation, and operational and maintenance capacity for improved service delivery.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data