Urban Renewal Trail
Sector: Water Supply and Storage • Location: Dayton, Iowa, United States of America
Source: Dodge USA
The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The proposed project includes 2,769 CY class 10 excavation, 4,474.6 SY subgrade preparation for shared use path, 170 LF of storm sewer pipe (15 inch to 24 inch), 1 SW-401 Manhole, 2 SW-512 intakes, 66.7 SY of 8" PCC Pavement, 2,309.8 SY of 6" PCC shared use path, 26.2 SY of 8" PCC shared u
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government
- Location
- Dayton, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Urban Renewal Trail
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes all materials, equipment, transportation, and labor necessary to complete the improvements. The proposed project includes 2,769 CY class 10 excavation, 4,474.6 SY subgrade preparation for shared use path, 170 LF of storm sewer pipe (15 inch to 24 inch), 1 SW-401 Manhole, 2 SW-512 intakes, 66.7 SY of 8" PCC Pavement, 2,309.8 SY of 6" PCC shared use path, 26.2 SY of 8" PCC shared use path, 439 SY of 8" PCC driveway, 72.8 tons of cover aggregate for a driveway, trail signage, t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Dayton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Waste Processing and Treatment, Government |
Article published date | 2024-11-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
