URBAN WATER SUPPLY PROJECT
Sector: Water Supply and Storage • Location: Cambodia
Source: World Bank Group
The Urban Water Supply Project seeks to: a) improve drinking water coverage, quality and access in Cambodia's two biggest cities; b) improve the performance of the water utilities in these cities; c) enhance availability of water for commercial and industrial purposes in these two cities as a spur to economic growth and as a means of ensuring viability of the utilities; and d) help the Government
- Status
- Closed
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government
- Location
- Cambodia
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about URBAN WATER SUPPLY PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Urban Water Supply Project seeks to: a) improve drinking water coverage, quality and access in Cambodia's two biggest cities; b) improve the performance of the water utilities in these cities; c) enhance availability of water for commercial and industrial purposes in these two cities as a spur to economic growth and as a means of ensuring viability of the utilities; and d) help the Government develop and implement an investment program based on a well-articulated water and sanitation sector policy framework. The project consists of three components: 1) Augmentation of water supply in Phnom Penh will be done through rehabilitation and extension of the Chruoy Chang War water treatment plant; supply of pipes, ancillary equipment and leak detection equipment; and technical assistance. 2) Augmentation of water supply in Sihanoukville will be done by raising the outlet weir and sealing off the sand spit to increase the storage of raw water; constructing four new groundwater wells; and improving distribution system. 3) Assistance to develop a water and sanitary policy framework for the sector as a whole will be provided through financing of consulting services. |
Original sector | FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Cambodia |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Waste Processing and Treatment, Commercial, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Cambodia
- Koh Kong Bridge
- Stung Atay River Hydropower Station
- CAMBODIA IRRIGATED AGRICULTURE IMPROVEMENT
- BAKHENG WATER SUPPLY PROJECT
- Stung Tatay River Hydropower Dam, Koh Kong
- Lower Sesan 2 Hydropower Dam Construction
- Cambodia: Integrated Water Resources Management Project
- Integrated Urban Environmental Management in the Tonle Sap Basin Project
