logo

Urgent Environmental Investment Project

Sector: Road • Location: Azerbaijan

Source: World Bank Group

Project
Closed

The Urgent Environmental Investment Project aims to direct action in four areas identified in the Azeri National Environmental Action Plan (NEAP), which are critically important for Azerbaijan's environment and economy, relatively small, and considered urgent. This project has 5 components. Component 1 restores the capacity of Azerbaijan to produce sturgeon fingerlings by building a new hatchery;

Project Information FAQ

Project Information

5 Q
The project “Urgent Environmental Investment Project” is an infrastructure initiative in the Road sector, located in Azerbaijan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Urgent Environmental Investment Project aims to direct action in four areas identified in the Azeri National Environmental Action Plan (NEAP), which are critically important for Azerbaijan's environment and economy, relatively small, and considered urgent. This project has 5 components. Component 1 restores the capacity of Azerbaijan to produce sturgeon fingerlings by building a new hatchery; and creates a sustainable institutional and financial basis for future hatchery operations. Component 2 demonstrates mercury cleanup technologies and procedures by decontaminating one heavily polluted area. It tests pilot-scale sludge treatment; develops and applies a low-technology method for mercury recovery; transports wastes; constructs a safe, new landfill; designs and implements a monitoring program for mercury emissions; and does a follow-up assessment. Component 3 tests cleanup methodologies on a pilot basis and mitigates existing pollution in one onshore oil field of the Abseron peninsula. It finances a series of pilot projects to determine the most cost-effective method for treating oil-contaminated sediments and sludge; cleans up oil residues; and continues operating the implementation unit in the state's oil company. Component 4 strengthens the environmental management system by reviewing its legislative and regulatory framework and building the capacity of the State Committee of Ecology. Component 5 consists of project management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data