logo
ProjectClosed

URI Bay Campus Phase 2

One of 6,743 projects Taiyo tracks in Rhode Island.

Source: Dodge

This project consists of two new buildings, renovation of 2 buildings, and demolition of 3 buildings. This bid package is for the Delegated Design Pre-Engineered Metal Building of one 33,740 building.

Status
Closed
Sector
Metal, Education, Commercial
Location
Narragansett, Rhode Island, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about URI Bay Campus Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “URI Bay Campus Phase 2” is an infrastructure initiative in the Metal sector, located in Narragansett, Rhode Island, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of two new buildings, renovation of 2 buildings, and demolition of 3 buildings. This bid package is for the Delegated Design Pre-Engineered Metal Building of one 33,740 building.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Rhode Island

City

Narragansett

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Metal, Education, Commercial

Article published date

2025-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project